|
|
|
Environmental Permitting Wildlife Management Wetland Delineation Environmental Assessments Protected Species Survey Marina Planning & Permitting Wetland Mitigation Wetland Master Planning Mitigation Banking "They have demonstrated time and time again the ability to resolve complex issues for their clients."
Josiah Williams
Southeastern Surveying, Inc. |
Mitigation Banks
Old Thorn Pond Mitigation Bank Bulloch County, Georgia The Old Thorn Pond Mitigation Bank is a 450-acre property in Bulloch County, Georgia that has been authorized through the issuance of a US Army Corps of Engineers permit to operate as a commercial wetlands mitigation bank. The purpose of the Bank is to provide compensatory mitigation for projects or permit applicants where on-site mitigation is not available, adequate, feasible or practicable. The Old Thorn Pond Mitigation Bank is available to provide compensatory mitigation, on a fee basis, for impacts to isolated or above the headwaters wetlands, within the identified service area (Service Area Map), which require authorization from the US Army Corps of Engineers under Section 404 of the Clean Water Act. Additionally, the mitigation bank is available to mitigate for authorized impacts associated with linear projects (i.e.: roadway and utility construction) on a case-by-case basis. The mitigation bank is not intended to bypass the normal sequencing requirements of the Section 404 permit review process (i.e.: avoidance, minimization, compensation). Mitigation credits from the Bank can only be utilized for projects or activities that have been properly authorized in accordance with all applicable state and federal laws and regulations. The ratio of mitigation credits in the Bank required to adequately compensate for wetland impacts will be determined on a site and/or project specific basis in accordance with the Savannah District Corps of Engineers Standard Operating Procedure for Compensatory Mitigation Plans. Historically, the 450-acre Old Thorn Pond was a cypress dominated Carolina Bay wetland area. Based on historical aerial photography, attempts were made to drain the site as early as 1949. Over time various owners successfully harvested the mature hardwood timber in the bay and completed site preparation activities to plant pines throughout the majority of the site. Prior to the restoration activities, the site was intensively managed for pine production. In 1998, the USACE and other members of the MBRT approved Old Thorn Pond as a Commercial Mitigation Bank. Since this time the owner has successfully accomplished full restoration of this unique habitat which includes:
Old Thorn Pond, LLC c/o Newkirk Environmental, Inc. P.O. Box 746 Mt. Pleasant, SC 29465 843/388-6585 FAX 843/388-6580 |
![]() ![]() ·Phase I Surveys ·GPS |
|
Corporate Headquarters - 1887 Clements Ferry Road - Charleston SC 29492 Toll-free: 800-569-3206 - Local: 843.388.6585 - Fax: 843.388.6580 |
||
|
© 2006 Newkirk Environmental Inc. Send your feedback about our Web site to webmaster@newkirkenvironmental.com. |